This new entertainment center includes a low rise casino with a partial second floor, restaurants, and its own central utility plant.
The structural steel installation included a bolted side plate seismic system, with wide flange members, long span joist framing, joists, stairs, and rails. We completed 658 complete joint penetration welds on this project, without a single rejection when tested.